U.S. flag

An official website of the United States government

Safe Drinking Water Information System (SDWIS) Federal Reporting Services

Your Drinking Water Query results from SDWIS Fed Reporting Services

PWS IDNJ0802001
PWS NameDEPTFORD TWP MUA
PWS TypeCommunity water system
Owner TypeLocal government
Primary SourceSurface water purchased
Primacy TypeState
Is Wholesaler?No
Population Served30561
County ServedGloucester

Note


The tables below list all violations that the state reported to EPA for this water system. Health-based violations are listed first, followed by treatment technique, MRDL, monitoring, reporting, and other violations.

Health-based Violations of maximum contaminant levels (MCLs) or maximum residual disinfectant levels (MRDLs), which specify the highest concentrations of contaminants or disinfectants, respectively, allowed in drinking water; or of treatment technique (TT) rules, which specify required processes intended to reduce the amounts of contaminants in drinking water. MCLs, MRDLs, and treatment technique rules are all health-based drinking water standards.
Maximum Contaminant Level or MCL The highest level of a contaminant that is allowed in drinking water. MCLs are set as close to the MCLGs as feasible using the best available treatment technology.
Treatment Technique A required process intended to reduce the level of a contaminant in drinking water.
Maximum residual disinfectant level or MRDL The highest level of a disinfectant allowed in drinking water. There is convincing evidence that addition of a disinfectant is necessary for control of microbial contaminants.
Monitoring & reporting Failure to conduct regular monitoring of drinking water quality, as required by SDWA, or to submit monitoring results in a timely fashion to the primacy agency or EPA.
Public notification & other Failure to provide notification to the public as required by the Violations of Public Notification Rule and the Consumer Confidence Report Rule, and violations of other requirements such as those violations related to variances and exemptions.

PWS Violation


Violations

Violation Category CodeViolation Type DescriptionRule NameContaminant NameViolation IDCompliance Status DescriptionCompliance Period Begin DateCompliance Period End DateIs Health Based Ind
MRMonitoring of Treatment (SWTR-Filter)Surface Water Treatment RuleSurface Water Treatment Rule37238Known01-JUN-202530-JUN-2025No
MRMonitoring and Reporting (DBP)Stage 1 Disinfectants and Disinfection Byproducts RuleChlorine37239Known01-APR-202530-JUN-2025No
MRMonitoring of Treatment (SWTR-Filter)Surface Water Treatment RuleSurface Water Treatment Rule37232Returned to Compliance01-NOV-202230-NOV-2022No
MRMonitoring, RegularSynthetic Organic Chemicals1,2-DIBROMO-3-CHLOROPROPANE37230Returned to Compliance01-APR-202230-JUN-2022No
MRMonitoring, RegularSynthetic Organic ChemicalsETHYLENE DIBROMIDE37231Returned to Compliance01-APR-202230-JUN-2022No
MRMonitoring and Reporting (DBP)Stage 2 Disinfectants and Disinfection Byproducts RuleTotal Haloacetic Acids (HAA5)37219Known01-FEB-202030-APR-2020No
MRMonitoring and Reporting (DBP)Stage 2 Disinfectants and Disinfection Byproducts RuleTTHM37218Known01-FEB-202030-APR-2020No
MRMonitoring, RegularRadionuclides and Revised Rad RuleRadium-22637236Returned to Compliance01-JAN-202031-DEC-2022No
MRMonitoring, RegularRadionuclides and Revised Rad RuleCombined Radium (-226 and -228)37235Returned to Compliance01-JAN-202031-DEC-2022No
MRMonitoring, RegularRadionuclides and Revised Rad RuleCombined Uranium37234Returned to Compliance01-JAN-202031-DEC-2022No
MRMonitoring, RegularRadionuclides and Revised Rad RuleGross Alpha, Excl. Radon and U37233Returned to Compliance01-JAN-202031-DEC-2022No
MRMonitoring, RegularRadionuclides and Revised Rad RuleRadium-22837237Returned to Compliance01-JAN-202031-DEC-2022No
MRMonitoring of Treatment (SWTR-Filter)Surface Water Treatment RuleSurface Water Treatment Rule37189Returned to Compliance01-SEP-201930-SEP-2019No
OtherConsumer Confidence Report Complete Failure to ReportConsumer Confidence RuleConsumer Confidence Rule37188Returned to Compliance01-JUL-2019 - No
MRMonitoring, RegularInorganic ChemicalsAntimony, Total37103Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsAntimony, Total37090Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsAntimony, Total37077Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37041Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37040Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37035Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37037Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37038Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularNitrate RuleNitrate37039Returned to Compliance01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsChromium37097Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsChromium37045Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsChromium37071Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsChromium37084Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsChromium37058Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsSelenium37067Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsSelenium37080Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsSelenium37093Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsSelenium37106Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsSelenium37054Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsNickel37075Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsNickel37101Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsNickel37088Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsNickel37062Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsNickel37049Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsMercury37074Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsMercury37100Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsMercury37048Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsMercury37061Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsMercury37087Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsFluoride37047Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsFluoride37086Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsFluoride37099Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsFluoride37073Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsFluoride37060Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsCYANIDE37059Known01-JAN-201731-DEC-2017No
MRMonitoring, RegularInorganic ChemicalsCYANIDE37072Known01-JAN-201731-DEC-2017No
  • 1 - 50 of 184

Enforcement Actions


Enforcement Actions

Latest Enforcement IDAssociated To Violation IDEnforcement Action Type CodeEnforcement Action DescriptionEnforcement DateOriginator DescriptionEnforcement Comment
1011637239SIEState Public Notification requested06-AUG-2025State -
1011437238SIEState Public Notification requested15-JUL-2025State -
1011237233SOXState Compliance achieved17-FEB-2023State -
1011237234SOXState Compliance achieved17-FEB-2023State -
1011237237SOXState Compliance achieved17-FEB-2023State -
1011237236SOXState Compliance achieved17-FEB-2023State -
1011237235SOXState Compliance achieved17-FEB-2023State -
1010737232SFJState Formal Notice of Violation issued13-DEC-2022State -
1010437230SFJState Formal Notice of Violation issued28-JUL-2022State -
1010437231SFJState Formal Notice of Violation issued28-JUL-2022State -
1010137219SIFState Public Notification received28-JUN-2021State -
1010137218SIFState Public Notification received28-JUN-2021State -
1008037189SFJState Formal Notice of Violation issued31-OCT-2019State -
1007937104SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937105SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937106SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937035SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937037SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937038SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937039SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937040SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937041SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937042SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937043SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937044SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937045SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937046SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937047SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937048SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937049SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937051SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937052SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937053SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937054SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937055SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937056SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937057SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937058SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937059SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937060SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937061SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937062SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937064SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937065SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937066SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937067SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937068SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937069SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937070SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
1007937071SFMState Administrative Penalty assessed03-SEP-2019StateOnly 5 TPs were active in the 2017 annual nitrate monitoring period. All other POE monitoring & reporting violations were in a 3 year federal monitoring period (2017-2019) that had a state specific monitoring period of 2017. Make-up samples were collected in 2018 and since this is a 1st time occurance a penalty will not be assessed. Nitrate M&R PNs were completed timely as part of the 2018 CCR, and all Inorganic M&R PNs were completed as part of the 2019 CCR (timely per the NONC issued by BSDW). -Sal
  • 1 - 50 of 184

PWS Facilities


All Facilities

Facility NameFacility IDIs SourceFacility Type DescriptionWater Type DescriptionAvailability DescriptionFacility Activity Status
NJEMS 08-206 PRINCETON BLVD32360YesConsecutive ConnectionSurface waterEmergencyActive
WELL 9R3882YesWell Ground waterPermanentActive
WELL 83881YesWell Ground waterPermanentActive
WELL 43880YesWell Ground waterPermanentActive
WELL 73879YesWell Ground waterPermanentActive
WELL 23876YesWell Ground waterPermanentActive
13875YesWell Ground waterPermanentActive
WELL 6R36919YesWell Ground waterPermanentActive
WELL 63878YesWell Ground waterOtherInactive
5-SEALED3877YesWell Ground waterOtherInactive
NJEMS 08-020 CLEMENTS BRIDGE ROAD-INTERC33425YesConsecutive ConnectionSurface waterPermanentActive
DISTRIBUTION SYSTEM15238NoDistribution System/Zone - - Active
HISTORICAL SAMPLING STATION23827NoSampling Station - - Active
PRINCETON BLVD543NoTreatment Plant - - Active
PRINCETON BLVD544NoTreatment Plant - - Active
HOUSTON AVE, WELL 4545NoTreatment Plant - - Active
WELL 9 TREATMENT PLANT546NoTreatment Plant - - Active
DELSEA DRIVE547NoTreatment Plant - - Active
BANKBRIDGE RD548NoTreatment Plant - - Active
WELL #8 TREATMENT PLANT549NoTreatment Plant - - Active
  • 1 - 20 of 20

PWS Treatment Processes


Treatment Processes

Facility NameFacility IDTreatment ProcessTreatment Objective
PRINCETON BLVD543Gaseous Chlorination, PostDisinfection
PRINCETON BLVD544Gaseous Chlorination, PostDisinfection
HOUSTON AVE, WELL 4545Filtration, GreensandIron removal
HOUSTON AVE, WELL 4545Gaseous Chlorination, PostDisinfection
HOUSTON AVE, WELL 4545SequestrationCorrosion control
HOUSTON AVE, WELL 4545PermanganateIron removal
HOUSTON AVE, WELL 4545Filtration, GreensandManganese removal
HOUSTON AVE, WELL 4545PermanganateManganese removal
WELL 9 TREATMENT PLANT546Gaseous Chlorination, PostDisinfection
WELL 9 TREATMENT PLANT546SequestrationCorrosion control
DELSEA DRIVE547Gaseous Chlorination, PostDisinfection
DELSEA DRIVE547SequestrationCorrosion control
BANKBRIDGE RD548Gaseous Chlorination, PostDisinfection
BANKBRIDGE RD548SequestrationCorrosion control
WELL #8 TREATMENT PLANT549Gaseous Chlorination, PostDisinfection
WELL #8 TREATMENT PLANT549SequestrationCorrosion control
  • 1 - 16 of 16

For more information on a Water System:
Ask the operators of your water system, contact your primacy agency or file a Freedom of Information Act (FOIA) request.
Drinking water in general: Find out more about your drinking water web site or call the Safe Drinking Water Hotline (1-800-426-4791). EPA has also prepared a table about various regulated drinking water contaminants.
Tools for accessing EPA drinking water data: Safe Drinking Water Information System (SDWIS) Federal Reporting Services and Drinking Water Performance and Results Report.
Research Data: As well as monitoring the levels of drinking water contaminants for which EPA has set standards, EPA, states, and water systems also carry out studies of contaminants that may need to be regulated in the future. For more information about these contaminants, please see the National Contaminant Occurrence Database.